CONTRACT AWARD - Railway installation and logistics - Ceneri Base Tunnel

The "Railway installation and logistics" contract concerns the installation of non-ballasted tracks of both single-track tunnels, each 15.4 km long, and the creation of the conventional ballasted tracks on the access routes to the portal, which will connect to the existing railway network. Several temporary services for the Ceneri Base Tunnel, such as logistics, transport, garages and sheds, are also included in the contract.