Projects » Systems » CENERI BASE TUNNEL - TRANCHE 812 VIGANA

 

CENERI BASE TUNNEL - TRANCHE 812 VIGANA

Tranche 812 "Vigana system" relates to the construction and management of the treatment plant for the water produced by the Ceneri Base Tunnel and its construction. This plant is located in Vigana in Camorino. With regard to the civil engineering works, the final design was assigned to Lombardi Engineering in Minusio while the design of the electromechanical works was assigned to Passavant Impianti SpA in Novate Milanese.