Preparatory work has begun for the extraordinary maintenance work on the load-bearing...
The assembly and testing of the tunnel boring machine (TBM) in the workshop has been...
The object of this contract is to strengthen the Melide – Grancia tunnel along the Lugano...
The purpose of this contract is the construction of a 5.5-km-long rock safety tunnel (1)...
Via Cancelliere Molo 21 - 6500 Bellinzona Tel: +41 (0)91 821 10 20 Fax: +41 (0)91 821 10 21 E-mail: info@pizzarotti.ch